One Team, Start to Finish
Architects/engineers, demolition, utilities, and construction under coordinated project controls.
- Hazmat survey & demo permitting
- Utility disconnects & temp services
- Inspection and geotech coordination
We coordinate everything from hazmat surveys and demolition permits to energy-efficient envelopes, inspections, and final handover—keeping budgets transparent and milestones on track.
Architects/engineers, demolition, utilities, and construction under coordinated project controls.
Milestone estimates—feasibility, 50% design, IFC—plus allowance tracking and change control.
Envelope upgrades aligned to local step-code targets, with blower-door testing and details that last.
| Project Type | Typical Duration | Typical Range (CAD) | Notes |
|---|---|---|---|
| Demo + New Build (2,000–3,500 sf) Rebuild | 10–16+ months | $350–$600+ / sf | Envelope level, site access, and custom finishes drive cost/schedule. |
| Laneway/Coach Home Accessory | 6–10 months | $300–$500+ / sf | Servicing, zoning, and energy step code affect pricing. |
| Major Site Works Site | +2–6 weeks | $25k–$150k | Rock excavation, shoring, drainage, and utility upgrades. |
*Ranges reflect Vancouver & the Lower Mainland and are refined after survey, design scope, and market pricing.
Rebuilds add demo/abatement and utility coordination up front. Expect similar build durations, with +4–10 weeks for hazmat, demo permits, and service work depending on site and municipality.
Most lenders use progress-draw construction loans tied to milestones (foundation, framing, lock-up, finishes). We supply schedules, cost ledgers, and inspection letters to support draws.
Yes—when the permit/IFC set is complete and allowances are defined, CCDC 2 fixed price is available. If selections or market conditions are evolving, cost-plus or CM options keep momentum.
We coordinate energy modeling, envelope details, and blower-door testing with the design team to hit targets and document compliance.
We arrange hazmat surveys, coordinate abatement if required, and manage demo permits, utility disconnects, and erosion control before excavation.
Ready to replace an aging house with a high-performance home—on your current lot?